European Council adopts new renewable energy directive

Solution for Bank of China 100kw Solar

16-10-2023

Customer Site Analysis

The Dah Sing Bank site is shown in the picture, and the customer's roof is a flat roof with a large roof area.


681d625e5f64b.jpg


Customer Demand

The Bank of China's monthly electricity consumption is around 1,000 kWh, with few large power-consuming devices. The customer's electricity is mainly used for self-consumption, and at the same time, the indoor heat insulation.


681d6288901c9.jpg

TEEJOIN Solar Energy Solution

681d62a8a0464.jpg


In view of the customer's actual situation, the company's engineers in the customer site inspection and measurement to give the following solutions:


Taking into account the installation site for the flat roof and the customer's electricity consumption, recommended installation of installed capacity of 10KW, first of all to ensure self-consumption, at the same time can be part of the power supply to the grid, you can get revenue.



Follow Us !  TEEJOIN SOLAR Power


teejoin Solar Panel Facebook   teejoin Solar Panel Instagram   teejoin Solar Panel LinkedIn   teejoin Solar Panel Pinterest   teejoin Solar Panel Twitter   teejoin Solar Panel YouTube



Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy